logo
Sussman Machinery(Wuxi) Co.,Ltd
ईमेल sales@suhangmachine.com दूरभाष: 86-136-0619-3016
घर > उत्पादों > केबल ट्रे रोल बनाने की मशीन >
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty

Place of Origin Wuxi, China
ब्रांड नाम Sussman
प्रमाणन CE, SGS, ISO
मॉडल संख्या एसएच एस एस
उत्पाद विवरण
रोलर स्टेशनों:
लगभग 1 9 स्टेशन
मुख्य शाफ्ट सामग्री:
45 # स्टील
मुख्य मोटर बिजली:
7.5kw
बिजली की आपूर्ति:
380V, 50Hz, 3phase
मशीन का आकार:
4.5mx0.8mx0.5m
नियंत्रण प्रणाली:
टच स्क्रीन के साथ पीएलसी
प्रमुखता देना: 

धातु मशीन के गठन

,

cable tray machine

भुगतान और शिपिंग शर्तें
Minimum Order Quantity
1 set
मूल्य
negotiable
Packaging Details
Standard package with film, plastic and steel wire.
Delivery Time
60 working days after deposit
Supply Ability
10 sets/month
उत्पाद वर्णन

Solar Strut Roll Forming Machine

 

 

Technical Parameter

 

 

1. Suitable Plate Material: thickness 1.5-3mm, Galvanized steel or blank steel

2. Working Speed: 12-15 meters / min

3. Forming Steps: 19 stations

4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome

5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining

6. Main Power with reducer: 22KW WH Chinese Famous

7. Cutting: Hydraulic Cutting Cr12mov

8. Material of Cutting Knife: Cr12Mov, Quench HRC58-62

9. The whole machine is controlled by industry computer-PLC.

10. PLC--Panasonic, Japan English and Chinese Language

11. Touch Screen--Panasonic Japan

12. Encoder--Omron, Japan

13.Electric parts--Schneider

14.Cutting holder: fly saw cutting

 

 

 Main Structure and Characters


 

   

Commodity & Description

  Quantity

   

5T manual uncoiler

  1 set

   

Leveing guiding

  1 set

 

 Servo feeding device

  1 set

   

Main roll forming machine

  1 set

 

 Punching Device

  1 set

 

 Cutting device

  1 set

 

 Finished products tabel

  1 set

 

 PLC control system

   1sets

 

 Out tables

  1 sets

   

Spare parts

  1 sets
 
 

 

Working Flow of Roll Forming Machine



Uncoiling-Feeding&Leveling-Punching--Roll forming-Cutting-Products collecting

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 0



A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

B.Servo Feeding Applicator............................................To feed the material accurately

C.Hydraulic/Press Punching...........................................To punch as requirements

D.Roll Forming Unit.........................................................To roll form as requirements

E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

F.Output Table................................................................Support the finished products

 

 

Standard profile of product

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 1

 

 Machine Photo

 

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 2

 

 

Customer Visiting
 
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 3
 
 
Loading picture
 
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 4
 
 
After-sale Serive

    - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.

    - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.

    - Training time: 5 days.

    - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.

    -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
 

सिफ़ारिश किये हुए उत्पाद

हमसे किसी भी समय संपर्क करें

86-136-0619-3016
NO.18-1, फ़नन रोड, वेनलिन, ज़ुटांग टाउन, जियांग्यिन शहर, जिआंगसु प्रांत, चीन।
अपनी जांच सीधे हमें भेजें